Construction is proceeding quickly with the floor slab complete and some of the structural steel framing in place. This now shows clearly the position of our new facility. The attached image shows the floor slab, with the blue pipes for the drainage connections visible. The excavations on the front side are for the posts that hold up the verandah. |
Recent announcements >